Click on the project images to view full details.
|
 view images  |
 |
Project
Mort St Balmain
Value
Approximately $500,000
Description
Individually designed architectural house
Raised steel walkway to main bedroom on second level
Constructed with a combination of concrete, steel and timber
Use of exposed steel is prominent throughout house
Home consists of luxury finishes and has been completed to the highest standard
|
 |
 view images  |
 |
Project
Alexandra St Tamarama
Value
Approximately $350,000
Description
Completed through the HIH Government Rescue Package
6 architecturally designed apartments
Waterproofing to planter boxes and balconies was completed
Due to failed bathroom membranes complete replacement was required
Exposed structural steel elements were wire brushed and correctly primed to handle the seaside conditions
General defects and poor workmanship were corrected throughout all units
|
 |
 view images  |
 |
Project
Parramatta Road Ashfield
Value
Approximately $250,000
Description
Emergency demolition of large 3 storey commercial building due to extensive fire
Asbestos contamination and safety issues addressed
Approved and correctly licensed subcontractors utilised
Completed quickly and efficiently to limit clients liability and public safety
|
 |
 view images  |
 |
Project
Bayview St Bronte
Value
Approximately $750,000
Description
Completed through the Vero Home Owners Warranty Scheme
House designed to maximize stunning views of Bronte beach
Waterproofing to of planter boxes and balconies was completed
Correction of cavity and sill flashings were required
Stone paving tiles were laid to large terrace areas and courtyards
Finished with state of the art appliances and technology throughout the house
Kitchen and bathrooms all completed with top of the range fittings and fixtures
|
 |
 view images  |
 |
Project
Woonona Rd Northbridge
Value
Approximately $450,000
Description
Grand Northbridge mansion
Completed through the Vero Home Owners Warranty Scheme
Imported stone tiled were installed to ground floor living areas and formal dining
Finished with state of the art appliances and technology throughout the house
Kitchen and bathrooms all completed with top of the range fittings and fixtures
Four large bedrooms complete with ensuites, completed to the highest standard
|
 |
 view images  |
 |
Project
Hoxton Park Road Cartwright
Value
Approximately $1,500,000
Description
Reconstruction of 3 fire destroyed industrial units
Structural steel and precast concrete panel construction
Completed under a tight program to minimize insurance company exposure
Mezzanine office fit outs with toilet and kitchen facilities
|
 |
 view images  |
 |
Project
Sherbrook Rd Hornsby
Value
Approximately $1,200,000
Description
Remedial works to a large 2 building tower complex
Roof framework required upgrading and re roofing was necessary
Installation of scaffolding to both entire towers was required
Replacement of waterproofing to leaking planter boxes
|
 |
 view images  |
 |
Project
Salisbury Rd Rosebay
Value
Approximately $1,500,000
Description
Completed through the Vero Home Owners Warranty Scheme
Completion of 3 highly finish apartments
Waterproofing to of planter boxes and balconies was completed
Correction of cavity and sill flashings were required
Finished with state of the art appliances and technology throughout the house
Kitchen and bathrooms all completed with top of the range fittings and fixtures
|
 |
 view images  |
 |
Project
Banksia Road Bellevue Hill
Value
Approximately $450,000
Description
Remedial works to block of 5 highly finished architectural townhouse apartments
Replacement of waterproofing to leaking planter boxes and balconies, including retiling as required
Application of faηade membrane to entire building
Rectification of onsite detention
Installation of cavity and sill flashings
|
 |
 view images  |
 |
Project
Elizabeth St Surry Hills
Value
Approximately $950,000
Description
Remedial works to block of 30 apartments
Replacement of waterproofing to leaking planter boxes and balconies, including retiling as required
Installation of required control joints to stop cracking
Repairs to render where cracked and drummy
Application of faηade membrane to entire building
Scaffolding of entire building was required
|
 |
 view images  |
 |
Project
Queenscliff Ave Queenscliff
Value
Approximately $400,000
Description
Refurbishment of 36 balconies due to exposure to harsh salt air of Manly Beach
High quality glass and stainless steel balconies were installed to maximize views
Waterproofing membranes and tiles were replaced to all balconies
Scaffolding of entire building was required due to cliff side position of building
Door and sill flashings were corrected where required
|
 |
 view images  |
 |
Project
Oaks Rd Dee Why
Value
Approximately $350,000
Description
Remedial works to block of 8 apartments
Replacement of waterproofing to leaking planter boxes and balconies, including retiling as required
Installation of required control joints to stop cracking
Repairs to render where cracked and drummy
Application of faηade membrane to entire building
Scaffolding of entire building was required
|